Blog for Petroleum Engineers of Al Habeeb CET, Chevalla.
Showing posts with label
As informed by Mr. Mukhtar Sir
.
Show all posts
Showing posts with label
As informed by Mr. Mukhtar Sir
.
Show all posts
Saturday, 3 November 2012
Lab External Dates: 2-1(PTME)
Lab External Dates:
8th November,2012(Thursday)
I.C. Engines/E.E. Lab
9th November, 2012(Friday)
Surveying/Geology Lab
Older Posts
Home
Subscribe to:
Posts (Atom)